Gravel Connect

Ridgeline Grading & Excavation · Colorado Springs, CO

Demo run saves in this browser only. Not shared accounts, not secure storage.

Earlier from dispatch

  • Change dump site — New dump site: Station 42+00, south shoulder. Spotter will wave you in.Oct 26, 2026 · 7:05 AM · Dana Whitfield

Truck 421

Bobby Traeger · Canyon Haul LLC

Done

Load at

Valley Pit & Aggregate — Scale House 2, Widefield

Dump at

US-24 STA 128+00 stockpile

Material

Road mix — CDOT Class 6

Today

4 load(s) · 98.2 tons

Location sharing on

Fixes will attach to each load.

Day complete

4 load(s) · 98.2 tons · 6:21 AM – 3:33 PM

Back to my jobs

Add scale ticket

Photograph or upload the ticket after each load.

Loads today (4)

  • VP-48220 · 25.0 tons

    Loaded 7:10 AM · Delivered 8:50 AM · Photo attached

    Verified
  • VP-48221 · 24.4 tons

    Loaded 9:23 AM · Delivered 10:07 AM · Photo attached

    Verified
  • VP-48222 · 23.8 tons

    Loaded 11:36 AM · Delivered 12:24 PM · Photo attached

    Disputed
  • VP-48223 · 25.0 tons

    Loaded 1:49 PM · Delivered 2:41 PM · Photo attached

    Verified