Gravel Connect

Ridgeline Grading & Excavation · Colorado Springs, CO

Demo run saves in this browser only. Not shared accounts, not secure storage.

Ridgeline Grading & Excavation

Contractor workspace · today's haul operations

See a completed day

Example finished loads, driver timecards, job and pit totals, and a draft bill — sample data only.

Open the example day

New customer opportunities

3 open leads

2 still need a price · about $4,892 of work on the table (demo estimate). These customers found you without a phone call.

Answer leads

Trucks working

7

13 dispatched today

Loads today

33

Tons today

812.3

Avg loads / truck

2.8

12 truck(s) on the board

Review required

8

1 disputed

Marketplace leads

3

2 need an answer

Awaiting terms

2

1 change request(s)

Unbilled work

$6,920

Fleet utilization

0%

Trucks working vs owned

Productive time

100%

0.0 h standby recorded

Truck efficiency

Counted from what drivers and tickets actually recorded today — nothing estimated.

Productive hours

18.7

Standby hours

0.0

Tons hauled

812.3

  • 421 · Bobby Traeger

    4 load(s) · 98.2 tons · 9.2 h · 4 with location evidence

  • SH-12 · Jesse Ontiveros

    4 load(s) · 99.6 tons · 9.5 h · 4 with location evidence

  • 412 · Tim Boyer

    3 load(s) · 73.2 tons · 0.0 h · 3 with location evidence

  • 418 · Andre Cole

    3 load(s) · 71.7 tons · 0.0 h · 3 with location evidence

  • SH-7 · Wes Duran

    3 load(s) · 76.2 tons · 0.0 h · 3 with location evidence

  • SH-9 · Dale Kimmer

    3 load(s) · 76.2 tons · 0.0 h

Pilot data. Hours come from driver start/stop taps; idle vs productive is split by recorded standby only — never guessed.

Accountability at a glance

Every load has a name, a time and, where permission was given, a location.

Tickets with a photo

32/33

Tickets with location evidence

27/33

Updates confirmed by drivers

4/6

Only counts a driver's own tap

Needing review

8

  • · Less office time: quotes, dispatch and updates replace phone calls and texts.
  • · Every job, work order, cost code, load, ticket, rate and invoice line stays connected.
  • · Rate terms are locked by both sides; changes go through an audited change request.
  • · Billable quantities are never quietly adjusted — discrepancies get flagged instead.

Location evidence appears only when a driver's phone granted permission. Gravel Connect never claims a location it didn't get.

Trucks on the clock

Every truck ties back to a work order and cost code.

  • 412 · Tim Boyer

    Canyon Haul LLC · P-2411 › WO-101 › 02-220

    Started 6:00 AM · 3 load(s)

    Loaded
  • 415 · Luis Ferrer

    Canyon Haul LLC · P-2411 › WO-101 › 02-220

    Started 6:07 AM · 3 load(s)

    Rerouted
  • 418 · Andre Cole

    Canyon Haul LLC · P-2411 › WO-101 › 02-220

    Started 6:14 AM · 3 load(s)

    On Job
  • 421 · Bobby Traeger

    Canyon Haul LLC · P-2411 › WO-101 › 02-220

    Started 6:21 AM · 4 load(s)

    Done
  • 424 · Marlene Ruiz

    Canyon Haul LLC · P-2411 › WO-101 › 02-220

    Started 6:28 AM · 1 load(s)

    Standby
  • SH-7 · Wes Duran

    Stone Hollow Trucking · P-2411 › WO-101 › 02-230

    Started 7:35 AM · 3 load(s)

    Loaded

Terms waiting on someone

No work should start before both sides accept.

Verification queue

Flagged work is never quietly adjusted.

  • Ticket VP-48217 · 23.3 tons

    No scale ticket photo attached

    Review
  • Ticket VP-48222 · 23.8 tons

    Driver tons do not match dispatcher record

    Disputed
  • Ticket VP-48228 · 26.0 tons

    Location permission denied on this device

    Review
  • Ticket VP-48229 · 25.4 tons

    Location permission denied on this device

    Review
  • Ticket VP-48230 · 24.8 tons

    Location permission denied on this device

    Review
  • Ticket VP-48235 · 22.8 tons

    Location unavailable on this device

    Review

Marketplace leads

Customers with no supplier yet — kept separate from your established work.

  • Trevor Mensah · 3× End Dump

    Structural fill · 260 tons · 1155 Marksheffel Rd, Colorado Springs

    Quotes Received
  • Marisol Quintero · 2× Side Dump

    Recycled asphalt (RAP) · 80 tons · Bijou St & Wahsatch Ave staging lot

    Requested
  • Bethany Oduya · 2× End Dump

    Road base (3/4" minus) · 150 tons · 6710 Antelope Ridge Rd, Colorado Springs

    Confirmed